Avon Barrier Company logo
   HOME
   PROFILE
   PARKING
  HIGH SECURITY
   INDUSTRIAL
   SERVICE
   ENQUIRIES
  LOCATIONS
   WHAT'S NEW
   JOB VACANCIES
   SITE MAP
Avon Barrier Company Ltd
Nova House
195 South Liberty Lane
Ashton Vale Trading Est.
Bristol BS3 2TN - UK
Tel: + 44 (0)117 953 5252
Fax: + 44 (0)117 953 5373
E-mail:
sales@avon-barrier.co.uk


TURKISH WEBSITE

 


BRITISH PROJECT ENGINEERING OF SPECIALIST VEHICLE AND PEDESTRIAN CONTROL SYSTEMS

Avon Barrier Company Ltd.
The aim of Avon Barrier Company is a simple one - to provide a comprehensive solution to our clients, in the field of vehicle and pedestrian control.
The company was formed in the 1980's by a group of engineers all of whom had considerable experience in vehicle control systems. Since its formation the company has evolved and developed into an authority in its specialist area.
By setting high standards of professionalism in its approach to providing solutions to its clients needs, Avon Barrier Company has gained a reputation for quality project design, management and system implementation.
With thousands of projects successfully completed worldwide, Avon Barrier Company are well placed to provide solutions on both a national and international basis.

HEAD OFFICE
DIVISIONS
Consultancy and Project Design Services DivisionProject Management DivisionManufacturing DivisionOperation and Maintenance Division
Please click on the Divisions above to view recent Projects

Consultancy and Project Design Services Division
Consultancy and Project Design Services
Recent Projects:

Toll Booth Plaza design and secure cash collection system (Bangladesh)
Security check point control system (Romania)
Auditable airport parking revenue collection systems (Kenya/Jordan)
Road Toll Collection System (Ghana)
Airside Security Barriers (UK)
Level Crossing Safety Barriers (Taiwan)

BACK TO TOP OF PAGE


Project Management Division
Project Management
Recent Projects:

High Security Vehicle and Pedestrian Control equipment at British Ministry of Defence Procurement HQ (Project duration 18 months)
Anti Raid Vehicle Blockers at secure cash handling depots and Government Buildings worldwide. (Average duration of 8 months)
Full Toll and Computerised Data Collection System on Jamuna Multipurpose Bridge (Project duration 15 months)
Anti terrorist interlocking vehicle traps on secure military establishments in Africa (Project duration 24 months)
Car Park Control Equipment on retail complexes (Project duration 18 months average)

BACK TO TOP OF PAGE



Manufacturing Division
Manufacturing Division
Recent Projects:

Multi Lane Vehicle Control Systems for the oil industry
Variable message signage for a major UK retailer
Traffic Light Control Equipment for out of town shopping development
Swing Bridge Lane Closure Barriers and Warning System
Vehicle Queue Control System for major Port Authority

BACK TO TOP OF PAGE



Operation and Maintenance Division
Operation and Maintenance Division
Recent Projects:

National maintenance agreement with British Telecom covering all perimeter control equipment UK wide
Numerous multi site maintenance agreements for local authorities, utility companies, Government agencies and major industries
Multisite system enabling works and road layout modification for international hotel group
Installation of Vehicle Control Equipment on international communications company security upgrade project
Roadside Safety Crash Rail Systems for single and multi storey car parks
Specialist Traffic Flow/Counting Induction Loop Detection Systems for major UK retailer

BACK TO TOP OF PAGE

USE THE LINKS (LEFT) TO EXPLORE OUR SITE FURTHER
CLICK HERE IF NO LINKS SHOWING ON THE LEFT